|
Maximum Cleanability
 Full Traceability
Every fitting quality inspected
Certifications
Maximum Cleanability
How easy contaminants can be removed from a surface Correct surface finish requirements
Chemical composition
No major physical and metallurgical flaws
Zero dead leg
Full Traceability

Positive Material Identification (PMI) |
Process routing (Job No.) |
 |
 |
Final Inspection – MTR |
Permanent marking |
 |
 | Every fitting quality inspected
Positive Material Identification (PMI)
Identification
- Suppliers C.O.T / C.O.A
- Heat Number
- Chemical composition
- Material grade – NITON XRF
Dimensional measurements
- Outer Diameter
- Wall Thickness
Visual Inspection
- Outer Diameter-by inspector’s human eye
- Internal Diameter - using Video Borescope
In-process control
Material issue per Job Number
- Matching the raw material to final product spec.
- Dimensional measurements
100% dimensional measurements in compliance with drawings
Ra measuring
100% Visual inspection
Final Inspections
Dimensional measurements
|
Outer Diameter |
Wall Thickness |
Off Angle |
|

|

|

|
|
Height |
Square-ness measuring |
|
|

|

|
|
Certifications
ISO 9001:2008
ISO 9001:2008 IQNET
TUV
CE
|